Build, Own, Operate: Why the First Year After Handover Decides a Building’s Real Cost

Most delay and dispute on a building project does not come from one bad contractor. It comes from the seams between contractors, where responsibility is ambiguous and nobody owns the gap. The direct cost of rework is usually smaller than the cost of the weeks spent establishing whose fault it was.

Where do construction projects actually lose money?

Projects lose money at handoffs rather than during execution. Every transition between parties — designer to contractor, contractor to supplier, contractor to owner, owner to operator — is a point where information is lost, assumptions diverge and accountability becomes contestable. Three of these handoffs cause most of the damage.

The three expensive handoffs

6.  Design to procurement. A specification written without reference to what is actually available locally produces either a long import lead time or an undocumented substitution. Both surface late, usually when the schedule has no slack left.

7.  Construction to commissioning. Systems installed by different subcontractors have to work together. When nobody owns integrated commissioning, faults appear after occupancy, when fixing them is most disruptive and most expensive.

8.  Handover to operations. A building is delivered either with as-built drawings, warranties, operating manuals and a maintenance regime, or with a set of keys. In the second case the operating team spends its first year discovering how the building works.

What “under one roof” actually removes

Integrated delivery means planning, design, construction, finishing and project management sit within one accountable structure, so the seams are internal rather than contractual. Revenco Holdings, established in 2016, works this way across apartments, commercial towers and larger developments. Alongside it, Revenco supplies the material side — cement and roofing, FRP products, STP raw materials and modules, and industrial machinery and equipment.

The gain is not primarily commercial. It is that problems surface while they are still cheap to fix, because the people who will build and operate the asset have visibility during the period when design decisions can still be reversed.

The phase nobody budgets for

Construction is a single event. Operations run for decades: maintenance, cleaning, security, utilities, repairs and eventual replacement. Decisions made to save money during construction routinely increase that operating cost for the life of the building.

The pattern is consistent. Equipment selected on capital cost alone with no local service network. Plant rooms laid out with no maintenance access. Systems specified without asking who will hold the competence to run them. When the facility management function reviews the design before freeze, these get caught. When it is appointed after handover, they get inherited. Within Unissol Group, GLX IT Solutions covers security solutions and facility management [[confirm the service scope and whether pre-handover design review is offered]].

A short handover checklist

Most of this is decided at contract stage rather than at handover, which is why it is worth asking early. Five questions cover the ground:

•    Who is contractually accountable for integrated commissioning, named in the contract?

•    What documentation is required at handover, and what happens if it is incomplete?

•    Is there a defects liability period, and who inspects before it expires?

•    Has the party who will operate the building reviewed the design?

•    Are warranties assignable to the owner, and who holds the local service relationship?

Projects that answer these clearly before award have fewer disputes afterwards. The risks do not disappear, and no delivery model makes them disappear. They get assigned to a named party before anyone has an incentive to argue, which is the part that matters.

FAQ

What is integrated project delivery?

Integrated project delivery coordinates design, supply, construction and operations under one accountability structure instead of contracting them separately, so the handoffs between phases sit inside one organisation rather than between parties.

Why do construction projects run late?

Most delay accumulates at the seams between contracted parties — design to procurement, construction to commissioning, and handover to operations — rather than during the execution of any single work package.

When should facility management be involved in a project?

Before design freeze. Facility management input at design stage catches maintenance access problems, equipment serviceability issues and operating cost decisions while they can still be changed, instead of inheriting them at handover.

What should a building owner receive at handover?

As-built drawings, operating and maintenance manuals, assignable warranties, commissioning records, a spares list and a maintenance schedule. Receiving only keys and a completion certificate means the first year of operation is spent reconstructing this information.

Share this post?

About author

More posts

Leave A Reply

Your email address will not be published. Required fields are marked *

Mohammad Omar Faruk

Director

Got a Specific Question?

Talk to a specialist in your industry

Engr. Abul Hossain Khan Mamun

Director

Engr. Abul Hossain Khan Mamun, a seasoned civil engineer with over 32 years of experience, has significantly shaped Bangladesh’s construction landscape through his leadership and expertise in managing complex building projects. Starting his career at Borak Real Estate Ltd., he progressed from site engineer to project engineer, overseeing residential developments in Banani, Gulshan, and Baridhara, and later led landmark projects like the 27-storey Unique Acropolis and the prestigious Westin Dhaka as Project In-Charge. His roles as Deputy General Manager, Head of Construction, and Director of Construction saw him spearhead high-profile developments, including Hotel Sheraton Dhaka and Borak Mehnur.

Got a Specific Question?

Talk to a specialist in your industry

Major Khalid Mahmud, psc (Retd)

Director

With nearly 23 years of distinguished service in the Bangladesh Army, Mr Khalid has built extensive leadership experience across diverse operational, administrative and international roles. He has attended multiple advanced military professional courses and has represented Bangladesh abroad with excellence and integrity.

 

Mr Khalid brings a disciplined, results-driven and ethical approach to all professional responsibilities, making him a strong asset for any multifaceted business group.

 

Alongside his military career, Mr Khalid has pursued strong academic development in Business, Human Resource Management and Supply Chain Management. His combined expertise in strategic planning, logistics, operations management and organizational leadership enables him to add significant value to corporate environments.

Got a Specific Question?

Talk to a specialist in your industry

Ahmad Ullah

Director

Ahmad Ullah has been a well-known expert in color management and color processing systems in Bangladesh since 1994. At present, he is primarily involved in sustainability initiatives across both textile and non-textile sectors in Bangladesh.

Got a Specific Question?

Talk to a specialist in your industry

Jukka Hakola

Advisor

With over 30 years of professional experience in the international energy, water technology and industrial sectors, Mr Hakola has developed strong leadership expertise across strategic management, business development and global sales operations. Throughout his career, he has held several senior executive roles including COO, Vice President, Managing Director and Board Member in technology-driven organisations.

 

Mr Hakola has played an important role in transforming technical innovations into successful commercial products, building international sales networks and leading organisational development initiatives. His extensive experience in strategic planning, market analysis and operational leadership enables him to effectively support business growth in global markets.

 

With academic qualifications in both Engineering and Economics and a results-driven leadership approach, Mr Hakola brings valuable expertise in technology commercialisation, international business development and organisational management.

Got a Specific Question?

Talk to a specialist in your industry

Dr. Sven Salahuddin Hasse

Advisor

Dr. Sven Salahuddin Hasse is a Doctor of dental surgery graduated in Germany. After 20 years of serving in the health sector, he devoted himself to promote sustainable technologies in the textile industry. He has aquired extensive knowledge about heat recovery and air filtration. There’s a huge demand in the Bangladesh market from the environmental point of view. Surprisingly, the majority of factories are reluctant to use innovative, sustainable technology even though it would enhance their provit margin on the long run.

Got a Specific Question?

Talk to a specialist in your industry

Engr. Fazle Monayem

Advisor

Engr. M. Fazle Monayem, a Civil Engineering graduate from Rajshahi Engineering College (RUET) in 1990, has over three decades of experience in Bangladesh’s major infrastructure projects. He played key roles in the Jamuna and Padma Multipurpose Bridges, Dhaleswari Bridge, Dhaka MRT Line-06, and several national road development initiatives. He has also contributed to industrial projects with Square Pharmaceuticals, Meghna Group, and Abdul Monem Economic Zone, making a lasting impact on the country’s development sector.

Got a Specific Question?

Talk to a specialist in your industry

MD Ekram Ullah

Advisor

MD Ekram Ullah is a seasoned professional with extensive experience in sustainability-driven initiatives across both textile and non-textile sectors in Bangladesh. His work is focused on advancing responsible industrial practices that align environmental stewardship with long-term business performance.

 

With a strong emphasis on sustainable solutions, he is actively involved in projects related to environmental management, resource efficiency and infrastructure development. Through a strategic and results-oriented approach, MD Ekram Ullah continues to contribute to the adoption of practical, scalable and environmentally responsible systems that support Bangladesh’s sustainable industrial growth.

Got a Specific Question?

Talk to a specialist in your industry

Rui Owase

Advisor

Rui Owase is a wastewater treatment expert with over 20 years of experience in environmental solutions. As the Division Managing Director of Daiki Axis, he oversees operations across Bangladesh, Sri Lanka, Myanmar, and Indonesia, driving sustainable water management initiatives.

 

His vision aligns with Unissol Group to protect the environment and build a better future. He focuses on promoting clean water solutions and supporting eco-friendly development for long-term impact.

Got a Specific Question?

Talk to a specialist in your industry